Post-Storm, Little Silver Takes On Infrastructure Upgrades
LITTLE SILVER – A storm July 3 not only flooded parts of the borough and brought widespread power outages but also dislodged the floating dock at Santelle Park, briefly shutting down the boat ramp. But these setbacks have not slowed the borough’s progress on long-term upgrades there and elsewhere in town.
In a recent interview, Mayor Bob Neff said the borough is moving ahead on several fronts, from emergency dispatch upgrades and storm-response coordination to improvements at Santelle Park and development near the train station.
The rainfall “knocked out” the floating dock at Santelle Park, Neff said.
Santelle Park
The dock has since been repaired, and the borough is planning a broader set of enhancements at the park: additional dock space, a shade structure, a restroom, a bocce court and a volleyball court. Neff said he expects visible progress within six months.
Power, and the response to it
The outages that followed the storm lasted several days in places, raising health and safety concerns for residents who rely on powered medical equipment or air conditioning.
Neff said he coordinated with mayors across the region over what they saw as deficiencies in JCP&L’s communication during the outage. The utility, he said, acknowledged there was room for improvement in the restoration estimates it gave residents.
Dispatch and development
A $262,600 LEAP grant is helping the borough move to countywide emergency dispatch, offsetting startup costs estimated at around $340,000. The change gives Little Silver access to a broader network of emergency responders.
A 13-unit townhouse development at 1 Sycamore Avenue, three units of which will be affordable, is moving forward. It counts toward the borough’s state-mandated affordable housing obligation of 98 units across two categories.
Traffic and drainage improvements planned for Willow Drive address concerns residents have raised for years. That work is also expected within six months.